Back

IRS/2025/7012/OCR

Notification details

Status Completed
First observed date 26 November 2025
First observed time 15:30
Organisation involved BP EXPLORATION OPERATING COMPANY LIMITED
Installation Andrew Platform
Field ANDREW
Latitude 58° 2' 51.122'' N
Longitude 1° 24' 15.552'' E
Quadrant / block no. 16 / 28

Breach details

Related to a breach where an OCR permit is in place Yes
Breached conditions Condition 2 Permitted chemicals. OPRED PON1 Guidance Appendix E: 'Non-compliant discharges from subsea hydraulic control system include: • control valves seized or stuck in position that results in an emission of hydraulic fluid from the location intended to discharge hydraulic fluid'
Related either wholly or partially to use and/or discharge of a chemical(s) Yes

Chemical 1

Chemical product released Castrol Transaqua HT2
Total quantity of chemical used in excess of permitted quantity (kg) 0
Total quantity of chemical released in excess of permitted quantity (kg) 610
Related to a subsea discharge No
Was the subsea discharge greater than 1 tonne over 12 hours No
Was the non compliance ever ongoing No

Formal investigation

Formal investigation ever opened No