PON10 Data
The following PON10 data is updated with the latest information and published at the start of each day.
Reference | Status | First observed | Organisation involved | Installation | Breach related to | Loss of power | Formal investigation opened | Notification related to |
---|---|---|---|---|---|---|---|---|
IRS/2024/5166/PON10 | Completed | 16 October 2024 | ENI UK LIMITED | Douglas DW Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/5164/PON10 | Completed | 15 October 2024 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/5149/PON10 | In review | 13 October 2024 | ODE ASSET MANAGEMENT LIMITED | Blythe Platform | No | |||
IRS/2024/5141/PON10 | Completed | 11 October 2024 | PERENCO UK LIMITED | Hyde Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/5138/PON10 | In review | 10 October 2024 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | No | |||
IRS/2024/5134/PON10 | Completed | 09 October 2024 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/5123/PON10 | Completed | 06 October 2024 | PERENCO UK LIMITED | Leman 27H | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/5122/PON10 | In review | 05 October 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/5095/PON10 | Completed | 02 October 2024 | PERENCO UK LIMITED | Excalibur A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/5092/PON10 | Completed | 01 October 2024 | PERENCO UK LIMITED | Inde D Platform (PERENCO) | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/5085/PON10 | Completed | 30 September 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 C Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/5066/PON10 | Completed | 26 September 2024 | APACHE NORTH SEA LIMITED | Forties FC Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2024/5047/PON10 | In review | 23 September 2024 | PERENCO UK LIMITED | Leman ED Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | |
IRS/2024/5043/PON10 | In review | 22 September 2024 | ENI UK LIMITED | Hamilton North Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/5036/PON10 | Completed | 21 September 2024 | VALARIS PLC | Valaris 121 | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2024/5028/PON10 | In review | 19 September 2024 | PERENCO UK LIMITED | DAVY | Consent Condition and Marking Schedule Condition | Yes, primary only | No | |
IRS/2024/5026/PON10 | In review | 17 September 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/5016/PON10 | Completed | 15 September 2024 | ENQUEST HEATHER LIMITED | Heather A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/5001/PON10 | Completed | 13 September 2024 | INEOS UK SNS LIMITED | Breagh Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4997/PON10 | In review | 12 September 2024 | ITHACA ENERGY (UK) LIMITED | Captain WPP'A' | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4992/PON10 | Completed | 11 September 2024 | CHRYSAOR NORTH SEA LIMITED | Armada Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works, Subsidiary Lights |
IRS/2024/4986/PON10 | Completed | 10 September 2024 | ENQUEST HEATHER LIMITED | Thistle A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4968/PON10 | In review | 06 September 2024 | SHELL U.K. LIMITED | Clipper PW Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4961/PON10 | In review | 04 September 2024 | SHELL U.K. LIMITED | Leman F Platform [SHELL] | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4959/PON10 | In review | 04 September 2024 | TOTALENERGIES E&P UK LIMITED | Valaris Stavanger | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4941/PON10 | In review | 01 September 2024 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | |
IRS/2024/4939/PON10 | In review | 01 September 2024 | SHELL U.K. LIMITED | Golf Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | |
IRS/2024/4912/PON10 | Completed | 24 August 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2024/4904/PON10 | In review | 23 August 2024 | SHELL U.K. LIMITED | Nelson Platform | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4900/PON10 | Completed | 22 August 2024 | PERENCO UK LIMITED | Lancelot Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4896/PON10 | In review | 18 August 2024 | CHRYSAOR NORTH SEA LIMITED | Armada Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4893/PON10 | Completed | 20 August 2024 | PERENCO UK LIMITED | Lancelot Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4889/PON10 | In review | 20 August 2024 | ITHACA ENERGY (UK) LIMITED | Stella FPF-1 | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4886/PON10 | In review | 12 August 2024 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | No | |||
IRS/2024/4876/PON10 | In review | 16 August 2024 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4868/PON10 | In review | 13 August 2024 | SHELL U.K. LIMITED | Penguins FPSO | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4866/PON10 | Completed | 13 August 2024 | PERENCO UK LIMITED | West Sole WB Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4847/PON10 | Completed | 10 August 2024 | TAQA BRATANI LIMITED | Brae East Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2024/4846/PON10 | Completed | 09 August 2024 | ITHACA ENERGY (UK) LIMITED | Captain WPP'A' | Consent Condition and Marking Schedule Condition | No | No | Secondary Power Supply |
IRS/2024/4845/PON10 | Completed | 04 August 2024 | REPSOL RESOURCES UK LIMITED | Montrose A Platform | Consent Condition excluding Marking Schedule Condition | No | No | AIS transponder failure |
IRS/2024/4833/PON10 | Completed | 05 August 2024 | PERENCO UK LIMITED | 30A | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4832/PON10 | Completed | 05 August 2024 | PERENCO UK LIMITED | Leman ED Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4815/PON10 | Completed | 25 July 2024 | BP EXPLORATION OPERATING COMPANY LIMITED | Clair Phase 1 Platform | No | |||
IRS/2024/4812/PON10 | In review | 02 August 2024 | SHELL U.K. LIMITED | golf | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4784/PON10 | Completed | 25 July 2024 | PERENCO UK LIMITED | Inde D Platform (PERENCO) | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4783/PON10 | Completed | 24 July 2024 | INEOS UK SNS LIMITED | Clipper South | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2024/4774/PON10 | Completed | 23 July 2024 | PERENCO UK LIMITED | 27G | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4765/PON10 | Completed | 20 July 2024 | PERENCO UK LIMITED | Ravenspurn South A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2024/4763/PON10 | Completed | 20 July 2024 | SPIRIT ENERGY RESOURCES LIMITED | Grove Wellhead Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4752/PON10 | In review | 18 July 2024 | SPIRIT ENERGY NORTH SEA LIMITED | Chiswick Platform | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4749/PON10 | Completed | 17 July 2024 | TAQA BRATANI LIMITED | Harding Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2024/4741/PON10 | Completed | 16 July 2024 | PERENCO UK LIMITED | Leman 27G | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4740/PON10 | Completed | 15 July 2024 | PERENCO UK LIMITED | Leman 27F | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights |
IRS/2024/4738/PON10 | Completed | 15 July 2024 | TAQA BRATANI LIMITED | Tern Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4733/PON10 | Completed | 14 July 2024 | SHELL U.K. LIMITED | Caravel QR | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2024/4718/PON10 | Completed | 13 July 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 52/5 A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4715/PON10 | Completed | 12 July 2024 | ITHACA ENERGY (UK) LIMITED | Captain FPSO | No | Main Lights | ||
IRS/2024/4712/PON10 | In review | 10 July 2024 | BP EXPLORATION OPERATING COMPANY LIMITED | Clair Ridge Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4694/PON10 | Completed | 05 July 2024 | PERENCO UK LIMITED | 27H | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4662/PON10 | In review | 29 June 2024 | SHELL U.K. LIMITED | Leman G Platform [SHELL] | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4660/PON10 | Completed | 27 June 2024 | PERENCO UK LIMITED | Waveney Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4659/PON10 | Completed | 27 June 2024 | PERENCO UK LIMITED | Excalibur A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4657/PON10 | Completed | 27 June 2024 | PERENCO UK LIMITED | Leman CD Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Primary Power Supply |
IRS/2024/4645/PON10 | Completed | 23 June 2024 | SPIRIT ENERGY NEDERLAND B.V., SPIRIT ENERGY NEDERLAND B.V. | Grove Wellhead Platform | No | Main Lights | ||
IRS/2024/4642/PON10 | Completed | 23 June 2024 | PERENCO UK LIMITED | West Sole WB Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4634/PON10 | Completed | 20 June 2024 | PERENCO UK LIMITED | Waveney Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4633/PON10 | Completed | 18 June 2024 | PERENCO UK LIMITED | West Sole WB Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4629/PON10 | Completed | 18 June 2024 | SPIRIT ENERGY NEDERLAND B.V., SPIRIT ENERGY NEDERLAND B.V. | Grove Wellhead Platform | No | Primary Power Supply | ||
IRS/2024/4612/PON10 | Completed | 16 June 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4600/PON10 | Completed | 11 June 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4577/PON10 | Completed | 07 June 2024 | SPIRIT ENERGY LIMITED | DPPA | No | |||
IRS/2024/4561/PON10 | Completed | 04 June 2024 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | No | |||
IRS/2024/4544/PON10 | Completed | 31 May 2024 | ONE-DYAS UK LIMITED | Sean PP Platform | Consent Condition excluding Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2024/4542/PON10 | Completed | 30 May 2024 | PERENCO UK LIMITED | Leman CD Platform [PERENCO] | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2024/4536/PON10 | In review | 21 May 2024 | CNR INTERNATIONAL (U.K.) LIMITED | Ninian Southern Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4518/PON10 | Completed | 24 May 2024 | ODE ASSET MANAGEMENT LIMITED | Garrow Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4512/PON10 | In review | 23 May 2024 | CENTRICA ENERGY STORAGE LIMITED | Rough BD Platform | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4505/PON10 | Completed | 22 May 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 52/5 A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights, Primary Power Supply |
IRS/2024/4498/PON10 | Completed | 19 May 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South CPP1 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2024/4497/PON10 | Completed | 20 May 2024 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | No | |||
IRS/2024/4474/PON10 | Completed | 13 May 2024 | ENI UK LIMITED | Hamilton North Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2024/4469/PON10 | In review | 13 May 2024 | PERENCO UK LIMITED | Ravenspurn North ST2 Platform | No | |||
IRS/2024/4464/PON10 | Completed | 12 May 2024 | PERENCO UK LIMITED | Leman ED Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights |
IRS/2024/4458/PON10 | Completed | 10 May 2024 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4451/PON10 | In review | 09 May 2024 | INEOS UK SNS LIMITED | Clipper South | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4450/PON10 | Completed | 08 May 2024 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4431/PON10 | Completed | 03 May 2024 | ITHACA ENERGY (UK) LIMITED | Stella FPF-1 | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4427/PON10 | Completed | 01 May 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 AP Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works, Secondary Lights, Subsidiary Lights |
IRS/2024/4416/PON10 | Completed | 30 April 2024 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights, Operations during the Works, Primary Power Supply, Secondary Power Supply, Subsidiary Lights |
IRS/2024/4396/PON10 | Completed | 26 April 2024 | REPSOL RESOURCES UK LIMITED | Piper B Platform | Consent Condition excluding Marking Schedule Condition | No | No | Secondary Lights |
IRS/2024/4388/PON10 | Completed | 14 April 2024 | PERENCO UK LIMITED | Pickerill A Jacket | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2024/4381/PON10 | Completed | 23 April 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 C Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Power Supply |
IRS/2024/4372/PON10 | Completed | 21 April 2023 | PERENCO UK LIMITED | 18B | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4366/PON10 | Completed | 18 April 2024 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4349/PON10 | Completed | 19 January 2024 | PERENCO UK LIMITED | Waveney Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4348/PON10 | Completed | 20 January 2024 | PERENCO UK LIMITED | Hyde Platform | Consent Condition and Marking Schedule Condition | No | No | No evidence of non-compliance but PON10 submitted following Trinity House inspection observations. Full functionality of NavAids were confirmed on 25/03 and 14/04 |
IRS/2024/4347/PON10 | Completed | 19 January 2024 | PERENCO UK LIMITED | Hoton Platform | Consent Condition and Marking Schedule Condition | No | No | No evidence of non-compliance. PON10 submitted following Trinity House inspection observations. Full NavAid functionality was confirmed on 25/03 |
IRS/2024/4344/PON10 | Completed | 15 April 2024 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Katy Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4343/PON10 | Completed | 13 April 2024 | NEO ENERGY PRODUCTION UK LIMITED | Global Producer III | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2024/4341/PON10 | Completed | 15 April 2024 | PERENCO UK LIMITED | Leman G Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4339/PON10 | Completed | 15 April 2024 | ENI UK LIMITED | Douglas DW Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4336/PON10 | Completed | 14 April 2024 | PERENCO UK LIMITED | Leman H Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4325/PON10 | Completed | 11 April 2024 | INEOS UK SNS LIMITED | Cavendish Platform | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2024/4323/PON10 | Completed | 17 March 2024 | PERENCO UK LIMITED | Ravenspurn South A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4301/PON10 | Completed | 07 April 2024 | PERENCO UK LIMITED | Leman ED Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/4297/PON10 | In review | 06 April 2024 | SHELL U.K. LIMITED | Barque PB Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/4293/PON10 | Completed | 19 January 2024 | ITHACA ENERGY (UK) LIMITED | Anglia A Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2024/4288/PON10 | Completed | 04 April 2024 | PERENCO UK LIMITED | Leman AC Platform [PERENCO] | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4250/PON10 | Completed | 24 March 2024 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works, Subsidiary Lights |
IRS/2024/4249/PON10 | In review | 23 March 2024 | SPIRIT ENERGY NEDERLAND B.V. | Chiswick Platform | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4233/PON10 | Completed | 22 March 2024 | SHELL U.K. LIMITED | Clipper PC Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels, Subsidiary Lights |
IRS/2024/4232/PON10 | Completed | 21 March 2024 | PERENCO UK LIMITED | 27H | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4222/PON10 | In review | 19 March 2024 | PERENCO UK LIMITED | Ravenspurn North ST3 Platform | No | |||
IRS/2024/4212/PON10 | Completed | 17 March 2024 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAA Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4169/PON10 | Completed | 06 March 2024 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | No | Primary Power Supply | ||
IRS/2024/4161/PON10 | Completed | 07 March 2024 | ENI UK LIMITED | Douglas DW Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/4141/PON10 | Completed | 02 March 2024 | ODE ASSET MANAGEMENT LIMITED | Garrow Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4126/PON10 | Completed | 28 February 2024 | ENI UK LIMITED | Douglas FPF Irish Sea Pioneer | Consent Condition and Marking Schedule Condition | No | No | In combined ops nav lights were not syncronised |
IRS/2024/4124/PON10 | Completed | 27 February 2024 | ODE ASSET MANAGEMENT LIMITED | Wenlock Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4110/PON10 | Completed | 24 February 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4094/PON10 | Completed | 21 February 2024 | ENI ENERGY E&P UK LIMITED | Cygnus B Platform | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2024/4083/PON10 | Completed | 17 February 2024 | TOTALENERGIES E&P UK LIMITED | Dunbar Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4070/PON10 | Completed | 17 February 2024 | REPSOL RESOURCES UK LIMITED | Arbroath Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals, Subsidiary Lights |
IRS/2024/4067/PON10 | In review | 12 February 2024 | BP EXPLORATION OPERATING COMPANY LIMITED | Ocean GreatWhite | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/4066/PON10 | Completed | 16 February 2024 | PERENCO UK LIMITED | 49/23D | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2024/4064/PON10 | Completed | 16 February 2024 | SHELL U.K. LIMITED | Barque PB Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2024/4058/PON10 | Completed | 13 February 2024 | BP EXPLORATION OPERATING COMPANY LIMITED | Mungo NUI Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Power Supply |
IRS/2024/4051/PON10 | Completed | 13 February 2024 | SHELL U.K. LIMITED | Shearwater C PUQ Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2024/4046/PON10 | Completed | 12 February 2024 | PERENCO UK LIMITED | Minerva | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4044/PON10 | Completed | 09 February 2024 | PETRODEC UK LIMITED | Leman 27J | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4040/PON10 | Completed | 10 February 2024 | TAQA BRATANI LIMITED | Cormorant A Platform | Consent Condition excluding Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2024/4034/PON10 | Completed | 10 February 2024 | PERENCO UK LIMITED | Inde AC Platform (PERENCO) | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2024/4031/PON10 | Completed | 09 February 2024 | PERENCO UK LIMITED | 49/23C | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4021/PON10 | Completed | 06 February 2024 | PERENCO UK LIMITED | 27G | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/4015/PON10 | Completed | 04 February 2024 | SPIRIT ENERGY NEDERLAND B.V. | Grove Wellhead Platform | No | Subsidiary Lights | ||
IRS/2024/4011/PON10 | Completed | 03 February 2024 | SHELL U.K. LIMITED | Cutter QC Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2024/4005/PON10 | Completed | 02 February 2024 | SHELL U.K. LIMITED | Valaris 122 | Consent Condition and Marking Schedule Condition | No | No | Identification Panels, Subsidiary Lights |
IRS/2024/3988/PON10 | Completed | 30 January 2024 | PERENCO UK LIMITED | 27E | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/3985/PON10 | Completed | 29 January 2024 | PERENCO UK LIMITED | Leman 27H | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/3976/PON10 | In review | 26 January 2024 | SHELL U.K. LIMITED | Valaris 121 | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/3972/PON10 | Completed | 25 January 2024 | TOTALENERGIES E&P UK LIMITED | Elgin PUQ Platform | No | Subsidiary Lights | ||
IRS/2024/3958/PON10 | Completed | 23 January 2024 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/3947/PON10 | Completed | 22 January 2024 | APACHE NORTH SEA LIMITED | Forties FE Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2024/3945/PON10 | Completed | 22 January 2024 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 C Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2024/3933/PON10 | Completed | 20 January 2024 | REPSOL RESOURCES UK LIMITED | Montrose A Platform | Consent Condition excluding Marking Schedule Condition | No | No | Radio and Radar Beacons |
IRS/2024/3929/PON10 | Completed | 18 January 2024 | CHRYSAOR PETROLEUM COMPANY U.K. LIMITED | Judy Platform | Consent Condition and Marking Schedule Condition | No | No | synchronisation |
IRS/2024/3928/PON10 | In review | 18 January 2024 | SHELL U.K. LIMITED | Leman D Platform [SHELL] | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2024/3924/PON10 | Completed | 16 January 2024 | TAQA BRATANI LIMITED | Cormorant A Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2024/3916/PON10 | Completed | 17 January 2024 | PETRODEC UK LIMITED | Leman 27 Juliet Installation | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/3915/PON10 | Completed | 16 January 2024 | ODE ASSET MANAGEMENT LIMITED | Babbage Platform | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2024/3907/PON10 | Completed | 15 January 2024 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/3906/PON10 | Completed | 14 January 2024 | PERENCO UK LIMITED | West Sole WC Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2024/3898/PON10 | Completed | 12 January 2024 | PERENCO UK LIMITED | Leman DD Platform [PERENCO] | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights, Subsidiary Lights |
IRS/2024/3890/PON10 | Completed | 10 January 2024 | PERENCO UK LIMITED | Pickerill B Platform | Consent Condition excluding Marking Schedule Condition | No | No | Consent Validity |
IRS/2024/3889/PON10 | In review | 09 January 2024 | SHELL U.K. LIMITED | Penguins FPSO | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2024/3883/PON10 | Completed | 10 January 2024 | PERENCO UK LIMITED | Ravenspurn North ST3 Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/3882/PON10 | Completed | 09 January 2024 | ODE ASSET MANAGEMENT LIMITED | Wenlock Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2024/3881/PON10 | Completed | 10 January 2024 | CNOOC PETROLEUM EUROPE LIMITED | Golden Eagle PUQ Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/3880/PON10 | Completed | 09 January 2024 | BP EXPLORATION OPERATING COMPANY LIMITED | Andrew Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/3879/PON10 | Completed | 09 January 2024 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2024/3860/PON10 | Completed | 05 January 2024 | SPIRIT ENERGY NORTH SEA LIMITED | Chiswick Platform | No |