Back

IRS/2021/90/OPPC

Notification details

Status Completed
First observed date 10 October 2010
First observed time 00:45
Organisation involved SHELL U.K. LIMITED
Installation Shearwater C PUQ Platform
Field SHEARWATER
Latitude 57° 1' 53.0'' N
Longitude 1° 57' 19.0'' E
Quadrant / block no. 22 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions OIW discharge greater than 100mg/ltr during start of Arran subsea field. OIW readings: 00:45 173.9mg/ltr discahrge to this point 0.0003t 03:38 101.3mg/ltr Discharged 0.0024t 09:50 26.5mg/ltr Discharged 0.0046t

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No