Back

IRS/2021/8/OPPC

Notification details

Status Completed
First observed date 24 September 2021
First observed time 08:35
Organisation involved SHELL U.K. LIMITED
Installation Shearwater C PUQ Platform
Field SHEARWATER
Latitude 57° 1' 53.0'' N
Longitude 1° 57' 19.0'' E
Quadrant / block no. 22 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Exceeding of Condition in Table 1 of the Oil Discharge permit – maximum concentration of 100mg/l.
Total oil discharged 0.131 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing Yes

Weather conditions

Wind direction 283°
Wind speed 26 knots
Significant wave height 3.1 metres

Formal investigation

Formal investigation ever opened No