IRS/2021/160/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 21 October 2021 |
First observed time | 13:17 |
Organisation involved | SPIRIT ENERGY PRODUCTION UK LIMITED |
Installation | Morecambe South CPP1 Platform |
Field | SOUTH MORECAMBE |
Latitude | 53° 50' 44.0'' N |
Longitude | 3° 35' 0.0'' W |
Quadrant / block no. | 110 / 03 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Routine Oil-in-Water monitoring of Produced water |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | Yes |
Non-compliance reasons related to Table 2 | Sampling and analysis method |
Non-compliance ever ongoing | No |
Weather conditions
Wind direction | 290° |
---|---|
Wind speed | 18 knots |
Significant wave height | 1.0 metres |
Formal investigation
Formal investigation ever opened | No |
---|