IRS/2021/243/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 05 November 2021 |
First observed time | 13:31 |
Organisation involved | EQUINOR UK LIMITED |
Installation | Mariner FSU |
Field | MARINER |
Latitude | 59° 36' 29.0'' N |
Longitude | 1° 4' 34.0'' E |
Quadrant / block no. | 9 / 11 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Condition 3 Permitted Discharges 3.1 The Operator shall only undertake Oil Discharge Operations in accordance with the arrangements described within the Permit Application, the Permit and the Standard Industry Conditions. H2S concentrations slops discharged to sea |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | Yes |
Weather conditions
Wind direction | 340° |
---|---|
Wind speed | 10 knots |
Significant wave height | 3.5 metres |
Formal investigation
Formal investigation ever opened | No |
---|