IRS/2021/261/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 07 November 2021 |
First observed time | 16:05 |
Organisation involved | BUMI ARMADA UK LIMITED |
Installation | Kraken FPSO |
Field | KRAKEN |
Latitude | 59° 55' 31.0'' N |
Longitude | 1° 17' 34.0'' E |
Quadrant / block no. | 9 / 2 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Following re-starting of the Hydraulic submersible power fluid pump (D) the minimum flow route was sampled, and the result was 545 mg/l (IR) for a measured flow of 50m3. Due to plant configuration there is no other way starting the pump without flowing an amount of produced water overboard from the pump minimum flow. |
Total oil discharged | 0.0272 tonnes |
Non-compliance details
Related to discharge limits in Table 1 | Yes |
---|---|
Non-compliance reasons related to discharge limits in Table 1 | Average concentration for the operation |
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|