Back

IRS/2021/261/OPPC

Notification details

Status Completed
First observed date 07 November 2021
First observed time 16:05
Organisation involved BUMI ARMADA UK LIMITED
Installation Kraken FPSO
Field KRAKEN
Latitude 59° 55' 31.0'' N
Longitude 1° 17' 34.0'' E
Quadrant / block no. 9 / 2

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Following re-starting of the Hydraulic submersible power fluid pump (D) the minimum flow route was sampled, and the result was 545 mg/l (IR) for a measured flow of 50m3. Due to plant configuration there is no other way starting the pump without flowing an amount of produced water overboard from the pump minimum flow.
Total oil discharged 0.0272 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Average concentration for the operation
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No