Back

IRS/2021/276/OPPC

Notification details

Status Completed
First observed date 10 November 2021
First observed time 14:05
Organisation involved EQUINOR UK LIMITED
Installation Mariner PDQ Platform
Field MARINER
Latitude 59° 35' 18.0'' N
Longitude 1° 3' 17.0'' E
Quadrant / block no. 9 / 11

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4. Discharge Conditions 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table. Equinor - Maximum concentration exceeded
Total oil discharged 0.3056 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No