IRS/2021/546/OPPC

Notification details

Status Completed
First observed date 25 December 2021
First observed time 18:00
Organisation involved TOTALENERGIES E&P UK LIMITED
Installation Alwyn North NAB Platform
Field ALWYN NORTH
Latitude 60° 48' 36.0'' N
Longitude 1° 44' 7.0'' E
Quadrant / block no. 3 / 09

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Produced water reinjection pump tripped resulting in produced water being discharged to sea. At the time of the occurrence the produced water had an oil concentration greater than 100mg/l.
Total oil discharged 0.0781 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No