IRS/2022/975/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 04 March 2022 |
| First observed time | 13:41 |
| Organisation involved | PERENCO UK LIMITED |
| Installation | Leman AC Platform [PERENCO] |
| Field | LEMAN [PERENCO][pt. of LEMAN] |
| Latitude | 53° 3' 17.0'' N |
| Longitude | 2° 14' 6.0'' E |
| Quadrant / block no. | 49 / 27 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | 4.2 (d) having been quantified at the flow metering location(s) |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | Yes |
| Non-compliance reasons related to Table 2 | Measurement uncertainty of produced water volume |
| Non-compliance ever ongoing | Yes |
Weather conditions
| Wind direction | 252° |
|---|---|
| Wind speed | 10 knots |
| Significant wave height | 0.6 metres |
Formal investigation
| Formal investigation ever opened | No |
|---|