IRS/2022/975/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 04 March 2022 |
First observed time | 13:41 |
Organisation involved | PERENCO UK LIMITED |
Installation | Leman AC Platform [PERENCO] |
Field | LEMAN [PERENCO][pt. of LEMAN] |
Latitude | 53° 3' 17.0'' N |
Longitude | 2° 14' 6.0'' E |
Quadrant / block no. | 49 / 27 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | 4.2 (d) having been quantified at the flow metering location(s) |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | Yes |
Non-compliance reasons related to Table 2 | Measurement uncertainty of produced water volume |
Non-compliance ever ongoing | Yes |
Weather conditions
Wind direction | 252° |
---|---|
Wind speed | 10 knots |
Significant wave height | 0.6 metres |
Formal investigation
Formal investigation ever opened | No |
---|