IRS/2022/1047/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 11 April 2022 |
First observed time | 08:00 |
Organisation involved | SHELL U.K. LIMITED |
Installation | Clipper PC Platform |
Field | CLIPPER NORTH |
Latitude | 53° 27' 33.0'' N |
Longitude | 1° 43' 56.0'' E |
Quadrant / block no. | 48 / 19 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Flow meter that is used for measuring produced reinjected water is non operational. |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | Yes |
Non-compliance reasons related to Table 2 | Calculation method |
Non-compliance ever ongoing | Yes |
Weather conditions
Wind direction | 140° |
---|---|
Wind speed | 25 knots |
Significant wave height | 1.4 metres |
Formal investigation
Formal investigation ever opened | No |
---|