IRS/2022/1133/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 30 April 2022 |
First observed time | 14:50 |
Organisation involved | TOTALENERGIES E&P UK LIMITED |
Installation | Alwyn North NAB Platform |
Field | ALWYN NORTH |
Latitude | 60° 48' 36.0'' N |
Longitude | 1° 44' 7.0'' E |
Quadrant / block no. | 3 / 09 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Individual OPPC non-compliance raised as OIW was above 300mg/l |
Total oil discharged | 0.1887 tonnes |
Non-compliance details
Related to discharge limits in Table 1 | Yes |
---|---|
Non-compliance reasons related to discharge limits in Table 1 | Maximum concentration |
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | Yes |
Weather conditions
Wind direction | 227° |
---|---|
Wind speed | 9 knots |
Significant wave height | 1.3 metres |
Formal investigation
Formal investigation ever opened | No |
---|