Back

IRS/2022/1214/OPPC

Notification details

Status Completed
First observed date 01 May 2022
First observed time 00:01
Organisation involved TOTALENERGIES E&P UK LIMITED
Installation Alwyn North NAB Platform
Field ALWYN NORTH
Latitude 60° 48' 36.0'' N
Longitude 1° 44' 7.0'' E
Quadrant / block no. 3 / 09

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Monthly Summary of May 2022 discharges to the sea of produced water with an oil content greater than 100mg/l.
Total oil discharged 0.1404 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing Yes

Weather conditions

Wind direction 160°
Wind speed 27 knots
Significant wave height 1.5 metres

Formal investigation

Formal investigation ever opened No