IRS/2022/1165/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 06 May 2022 |
First observed time | 15:55 |
Organisation involved | SHELL U.K. LIMITED |
Installation | Shearwater C PUQ Platform |
Field | SHEARWATER |
Latitude | 57° 1' 53.0'' N |
Longitude | 1° 57' 19.0'' E |
Quadrant / block no. | 22 / 30 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Exceedance of Condition in Table 1 of the Oil Discharge permit – maximum concentration of 100mg/l 1 x samples above this limit |
Total oil discharged | 0.0069 tonnes |
Non-compliance details
Related to discharge limits in Table 1 | Yes |
---|---|
Non-compliance reasons related to discharge limits in Table 1 | Maximum concentration |
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|