IRS/2022/1267/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 28 May 2022 |
| First observed time | 03:16 |
| Organisation involved | ENI UK LIMITED |
| Installation | Douglas OSI |
| Field | DOUGLAS |
| Latitude | 53° 40' 58.0'' N |
| Longitude | 3° 32' 46.0'' W |
| Quadrant / block no. | 110 / 08 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | 4 Discharge Conditions 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table. Oil in Produced Water Concentration greater than 100mg/l - On 28th May 2022 at 03:16 Maximum Concentration was 115 mg/l And on 28th May 2022 at 11:24 Maximum Concentration was 121mg/l |
| Total oil discharged | 0.0098 tonnes |
Non-compliance details
| Related to discharge limits in Table 1 | Yes |
|---|---|
| Non-compliance reasons related to discharge limits in Table 1 | Maximum concentration |
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | No |
| Non-compliance ever ongoing | No |
Formal investigation
| Formal investigation ever opened | No |
|---|