IRS/2022/1697/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 16 August 2022 |
| First observed time | 09:00 |
| Organisation involved | PERENCO UK LIMITED |
| Installation | Hyde Platform |
| Field | HYDE |
| Latitude | 53° 48' 26.0'' N |
| Longitude | 1° 1' 43.0'' E |
| Quadrant / block no. | 48 / 06 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | Table 2- monitoring states, "At least 1 sample per month. If it is a normally unmanned installation, sampling should take place at least once during every planned maintenance visit" During the month of July, a maintenance visit to Hyde took place but no sample was taken. |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | Yes |
| Non-compliance reasons related to Table 2 | Sampling frequency |
| Non-compliance ever ongoing | No |
Formal investigation
| Formal investigation ever opened | No |
|---|