Back

IRS/2022/1958/OPPC

Notification details

Status Completed
First observed date 26 October 2022
First observed time 09:30
Organisation involved DANA PETROLEUM (E&P) LIMITED
Installation Western Isles FPSO
Field BARRA
Latitude 61° 12' 52.0'' N
Longitude 0° 45' 13.0'' E
Quadrant / block no. 210 / 24

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions OPPC non-compliance: water injection used for ILI pig runs was biocide dosed – minimum flow valves from HP & Booster Pumps not included on discharge permit for the operation – these valves discharge overside. During the operation the minimum flow valves open as per design to protect the associated pumps.

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 Yes
Non-compliance reasons related to other discharge information in Table 1 Circumstances of use
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No