Back

IRS/2022/2137/OPPC

Notification details

Status Completed
First observed date 28 November 2022
First observed time 14:30
Organisation involved BP EXPLORATION OPERATING COMPANY LIMITED
Installation Glen Lyon FPSO
Field SCHIEHALLION
Latitude 60° 21' 24.0'' N
Longitude 4° 4' 0.0'' W
Quadrant / block no. 204 / 20

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Condition 4.1 was breached as the limit for discharge point 3 (stated in Table 1) was exceeded.
Total oil discharged 0.47 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Forecast annual mass
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Weather conditions

Wind direction
Wind speed 0 knots
Significant wave height 0.0 metres

Formal investigation

Formal investigation ever opened No