Back

IRS/2022/615/OPPC

Notification details

Status Completed
First observed date 04 January 2022
First observed time 09:41
Organisation involved PERENCO UK LIMITED
Installation Hyde Platform
Field HYDE
Latitude 53° 48' 26.0'' N
Longitude 1° 1' 43.0'' E
Quadrant / block no. 48 / 06

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions A routine oil in produced water sample was completed on 15.12.21, and sent for analysis. On the 04.01.22 the results came back as 31mg/l. Since the limit on the permit is 30mg/l this non-conformance has been raised.
Total oil discharged 0.0036 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Monthly average concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing Yes

Weather conditions

Wind direction
Wind speed 1 knots
Significant wave height 1.0 metres

Formal investigation

Formal investigation ever opened No