Back

IRS/2022/643/OPPC

Notification details

Status Completed
First observed date 17 January 2022
First observed time 04:00
Organisation involved TOTALENERGIES E&P UK LIMITED
Installation Alwyn North NAB Platform
Field ALWYN NORTH
Latitude 60° 48' 36.0'' N
Longitude 1° 44' 7.0'' E
Quadrant / block no. 3 / 09

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Produced water reinjection pump tripped resulting in produced water being discharged to sea. At the time of the occurrence the produced water had an oil concentration greater than 100mg/l.

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum load
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing Yes

Formal investigation

Formal investigation ever opened No