IRS/2022/727/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 23 December 2021 |
First observed time | 01:30 |
Organisation involved | REPSOL RESOURCES UK LIMITED |
Installation | Clyde Platform |
Field | FLYNDRE |
Latitude | 56° 27' 10.0'' N |
Longitude | 2° 17' 18.0'' E |
Quadrant / block no. | 30 / 17 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Bespoke condition - 6.1 Repsol Sinopec Resources UK Ltd (RSRUK) are permitted to route Flyndre Produced Water via Alternative Discharge Route 1 for short periods (up to 36hours) during Flyndre cold start-up operations as described within the permit application supporting documents, until commencement of the planned TAR in summer 2022. |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|