IRS/2023/2291/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 04 January 2023 |
First observed time | 16:00 |
Organisation involved | ENI ENERGY E&P UK LIMITED |
Installation | Valaris Gorilla VI |
Field | SEAGULL |
Latitude | 57° 9' 13.0'' N |
Longitude | 1° 40' 24.0'' E |
Quadrant / block no. | 22 / 29 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | 4.2 Following the BEIS inspection of the Borr prospector 1 it was brought to Neptune's attention that rig drainage which was being discharged now requires an ODP. Upon checking with the Valaris Gorilla IV it became apparent that the rig was in the same situation as the Prospector 1 i.e. drains were being discharged to sea and thus a permit is required. The rig has been operating in this manner for some time and thus a non compliance is being reported. |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|