IRS/2023/2325/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 11 January 2023 |
First observed time | 12:00 |
Organisation involved | ENI ENERGY E&P UK LIMITED |
Installation | Cygnus B Platform |
Field | CYGNUS |
Latitude | 54° 35' 59.0'' N |
Longitude | 2° 11' 41.0'' E |
Quadrant / block no. | 44 / 11 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | Haz Open Drains and Non-haz open drains sample was not taken during the month of December for the Cygnus Bravo installation. |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | Yes |
Non-compliance reasons related to Table 2 | Sampling frequency |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|