Back

IRS/2023/2488/OPPC

Notification details

Status Completed
First observed date 27 February 2023
First observed time 12:00
Organisation involved TOTALENERGIES E&P UK LIMITED
Installation Elgin PUQ Platform
Field ELGIN
Latitude 57° 0' 44.0'' N
Longitude 1° 50' 24.0'' E
Quadrant / block no. 22 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4 Discharge Conditions, 4.3 Sampling and quantification of the discharge(s) in Table 1 shall be carried out by the Permit Holder in accordance with the requirements for monitoring specified in Table 2.

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 No
Related to Table 2 Yes
Non-compliance reasons related to Table 2 Measurement uncertainty of produced water volume
Non-compliance ever ongoing Yes

Weather conditions

Wind direction 280°
Wind speed 11 knots
Significant wave height 3.3 metres

Formal investigation

Formal investigation ever opened No