Back

IRS/2023/3106/OPPC

Notification details

Status Completed
First observed date 26 July 2023
First observed time 16:00
Organisation involved PERENCO UK LIMITED
Installation Leman BD Platform [PERENCO]
Field LEMAN [PERENCO][pt. of LEMAN]
Latitude 53° 3' 7.0'' N
Longitude 2° 17' 10.0'' E
Quadrant / block no. 49 / 27

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4.2 The discharge(s) from the source(s) specified in Table 1, shall only be permitted: (e) having been sampled at the sampling location and 4.3 Sampling and quantification of the discharge(s) in Table 1 shall be carried out by the Operator in accordance with the requirements for monitoring specified in Table 2.

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 No
Related to Table 2 Yes
Non-compliance reasons related to Table 2 Sampling frequency
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No