Back

IRS/2023/3120/OPPC

Notification details

Status Completed
First observed date 28 July 2023
First observed time 10:00
Organisation involved PERENCO UK LIMITED
Installation Inde AC Platform (PERENCO)
Field INDEFATIGABLE [PERENCO]
Latitude 53° 19' 25.0'' N
Longitude 2° 34' 29.0'' E
Quadrant / block no. 49 / 23

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4.2 The discharge(s) from the source(s) specified in Table 1, shall only be permitted: (e) having been sampled at the sampling location(s) as specified in that Table

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 No
Related to Table 2 Yes
Non-compliance reasons related to Table 2 Sampling frequency
Non-compliance ever ongoing Yes

Weather conditions

Wind direction 340°
Wind speed 9 knots
Significant wave height 1.0 metres

Formal investigation

Formal investigation ever opened No