IRS/2023/3120/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 28 July 2023 |
First observed time | 10:00 |
Organisation involved | PERENCO UK LIMITED |
Installation | Inde AC Platform (PERENCO) |
Field | INDEFATIGABLE [PERENCO] |
Latitude | 53° 19' 25.0'' N |
Longitude | 2° 34' 29.0'' E |
Quadrant / block no. | 49 / 23 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | 4.2 The discharge(s) from the source(s) specified in Table 1, shall only be permitted: (e) having been sampled at the sampling location(s) as specified in that Table |
Non-compliance details
Related to discharge limits in Table 1 | No |
---|---|
Related to other discharge information in Table 1 | No |
Related to Table 2 | Yes |
Non-compliance reasons related to Table 2 | Sampling frequency |
Non-compliance ever ongoing | Yes |
Weather conditions
Wind direction | 340° |
---|---|
Wind speed | 9 knots |
Significant wave height | 1.0 metres |
Formal investigation
Formal investigation ever opened | No |
---|