Back

IRS/2023/3234/OPPC

Notification details

Status Completed
First observed date 30 August 2023
First observed time 11:40
Organisation involved TAQA BRATANI LIMITED
Installation Tern Platform
Field TERN
Latitude 61° 16' 33.0'' N
Longitude 0° 55' 10.0'' E
Quadrant / block no. 210 / 25

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Produced water overboard samples in excess of the maximum permitted allowable concentration of 100mg/l. on A-train and Hudson produced water overboard routes.
Total oil discharged 0.0225 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No