IRS/2023/3236/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 21 August 2023 |
| First observed time | 16:00 |
| Organisation involved | TAQA BRATANI LIMITED |
| Installation | Tern Platform |
| Field | TERN |
| Latitude | 61° 16' 33.0'' N |
| Longitude | 0° 55' 10.0'' E |
| Quadrant / block no. | 210 / 25 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | Train B was briefly brought online following a shutdown and then taken offline again between the 21st and 22nd August. Over this 48 hour period, Train B was discharging overboard for approximately 4 hours (2 X 2 hour periods) before being taken offline due to lack of water. During these short periods it was not possible to collect samples. The total volume of water discharged over the 4 hour period was 168m3. |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | Yes |
| Non-compliance reasons related to Table 2 | Sampling frequency |
| Non-compliance ever ongoing | No |
Formal investigation
| Formal investigation ever opened | No |
|---|