IRS/2023/3331/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 15 September 2023 |
| First observed time | 12:00 |
| Organisation involved | PERENCO UK LIMITED |
| Installation | Leman BD Platform [PERENCO] |
| Field | LEMAN [PERENCO][pt. of LEMAN] |
| Latitude | 53° 3' 7.0'' N |
| Longitude | 2° 17' 10.0'' E |
| Quadrant / block no. | 49 / 27 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | 4.2 The discharge(s) from the source(s) specified in Table 1, shall only be permitted: (e) having been sampled at the sampling location and 4.3 Sampling and quantification of the discharge(s) in Table 1 shall be carried out by the Operator in accordance with the requirements for monitoring specified in Table 2. |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | Yes |
| Non-compliance reasons related to Table 2 | Sampling frequency |
| Non-compliance ever ongoing | No |
Formal investigation
| Formal investigation ever opened | No |
|---|