Back

IRS/2023/3486/OPPC

Notification details

Status Completed
First observed date 20 October 2023
First observed time 11:25
Organisation involved DANA PETROLEUM (E&P) LIMITED
Installation Triton FPSO
Field GUILLEMOT WEST
Latitude 57° 5' 2.0'' N
Longitude 0° 53' 32.0'' E
Quadrant / block no. 21 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4 Discharge Conditions 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table. Maximum concentration of oil in produced water discharge from slops >100
Total oil discharged 0.0029 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No