IRS/2023/3616/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 11 November 2023 |
First observed time | 13:00 |
Organisation involved | TOTALENERGIES E&P UK LIMITED |
Installation | Alwyn North NAB Platform |
Field | ALWYN NORTH |
Latitude | 60° 48' 36.0'' N |
Longitude | 1° 44' 7.0'' E |
Quadrant / block no. | 3 / 09 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | breached Discharge of Produced Water to Sea with OIW greater than 100mg/l . This OPPC has been raised in addition to November monthly ongoing OIW OPPC as a sample greater than 300mg/l was measured. |
Total oil discharged | 0.0326 tonnes |
Non-compliance details
Related to discharge limits in Table 1 | Yes |
---|---|
Non-compliance reasons related to discharge limits in Table 1 | Maximum concentration |
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|