Back

IRS/2024/3861/OPPC

Notification details

Status Completed
First observed date 04 January 2024
First observed time 13:45
Organisation involved DANA PETROLEUM (E&P) LIMITED
Installation Triton FPSO
Field GUILLEMOT WEST
Latitude 57° 5' 2.0'' N
Longitude 0° 53' 32.0'' E
Quadrant / block no. 21 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Maximum concentration of oil in produced water discharged from slops > 100 mg/L
Total oil discharged 0.1587 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No