IRS/2024/3961/OPPC

Notification details

Status Completed
First observed date 21 January 2024
First observed time 19:40
Organisation involved TAQA BRATANI LIMITED
Installation Tern Platform
Field TERN
Latitude 61° 16' 33.0'' N
Longitude 0° 55' 10.0'' E
Quadrant / block no. 210 / 25

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Failure of A Train produced water meter has resulted in measurement uncertainty of produced water overboard volume being out with the permitted range of +/-10%.

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 No
Related to Table 2 Yes
Non-compliance reasons related to Table 2 Sampling and analysis method
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No