IRS/2024/3973/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 23 January 2024 |
| First observed time | 15:00 |
| Organisation involved | BP EXPLORATION OPERATING COMPANY LIMITED |
| Installation | Glen Lyon FPSO |
| Field | SCHIEHALLION |
| Latitude | 60° 21' 24.0'' N |
| Longitude | 4° 4' 0.0'' W |
| Quadrant / block no. | 204 / 20 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | Condition 4.2c. An increased produced water discharge from discharge pt 3. This is due to a passing Flow Control Valve (FCV) directed to discharge pt 3. This scenario was not described in the purpose of discharge 3 (which is for PW pump start up). |
| Total oil discharged | 0.001 tonnes |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | No |
| Non-compliance ever ongoing | Yes |
Weather conditions
| Wind direction | 145° |
|---|---|
| Wind speed | 40 knots |
| Significant wave height | 4.8 metres |
Formal investigation
| Formal investigation ever opened | No |
|---|