IRS/2024/4116/OPPC

Notification details

Status Completed
First observed date 26 February 2024
First observed time 14:00
Organisation involved CNR INTERNATIONAL (U.K.) LIMITED
Installation Ninian Central Platform
Field NINIAN
Latitude 60° 51' 24.0'' N
Longitude 1° 28' 9.0'' E
Quadrant / block no. 3 / 03

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Oil Discharged with Produced Water >1 tonne in 12hrs.
Total oil discharged 1.1 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum load
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Weather conditions

Wind direction 259°
Wind speed 11 knots
Significant wave height 2.3 metres

Formal investigation

Formal investigation ever opened No