Back

IRS/2024/5067/OPPC

Notification details

Status Completed
First observed date 25 September 2024
First observed time 18:15
Organisation involved CNR INTERNATIONAL (U.K.) LIMITED
Installation Tiffany Platform
Field TIFFANY
Latitude 58° 29' 0.0'' N
Longitude 1° 16' 0.0'' E
Quadrant / block no. 16 / 17

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Section 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table.
Total oil discharged 0.1677 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No