IRS/2024/5080/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 29 September 2024 |
First observed time | 12:00 |
Organisation involved | CNR INTERNATIONAL (U.K.) LIMITED |
Installation | Ninian Central Platform |
Field | NINIAN |
Latitude | 60° 51' 24.42'' N |
Longitude | 1° 28' 8.73'' E |
Quadrant / block no. | 3 / 3 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | 4.1 |
Total oil discharged | 0.242 tonnes |
Non-compliance details
Related to discharge limits in Table 1 | Yes |
---|---|
Non-compliance reasons related to discharge limits in Table 1 | Maximum load |
Related to other discharge information in Table 1 | No |
Related to Table 2 | No |
Non-compliance ever ongoing | No |
Weather conditions
Wind direction | 160° |
---|---|
Wind speed | 15 knots |
Significant wave height | 3.2 metres |
Formal investigation
Formal investigation ever opened | No |
---|