Back

IRS/2024/5345/OPPC

Notification details

Status Completed
First observed date 21 November 2024
First observed time 16:17
Organisation involved PERENCO UK LIMITED
Installation Ravenspurn South C Platform
Field RAVENSPURN S[pt.of RAVENSPURN]
Latitude 54° 5' 0.0'' N
Longitude 0° 49' 30.0'' E
Quadrant / block no. 42 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Condition 3.1: The Permit Holder shall only undertake Oil Discharge Operations in accordance with the arrangements described within the Permit Application, the Permit and the Standard Industry Conditions.

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing Yes

Weather conditions

Wind direction
Wind speed 0 knots
Significant wave height 0.0 metres

Formal investigation

Formal investigation ever opened No