IRS/2024/5372/OPPC
Notification details
Status | Completed |
---|---|
First observed date | 19 November 2024 |
First observed time | 08:40 |
Organisation involved | PERENCO UK LIMITED |
Installation | Leman BD Platform [PERENCO] |
Field | LEMAN [PERENCO][pt. of LEMAN] |
Latitude | 53° 3' 7.476'' N |
Longitude | 2° 17' 10.818'' E |
Quadrant / block no. | 49 / 27 |
Breached conditions details
Related to a breach of an approved permit | Yes |
---|---|
Breached conditions | 4 Discharge Conditions 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table. 4.2 e) having been sampled at the sampling location(s) as specified in that Table. |
Non-compliance details
Related to discharge limits in Table 1 | Yes |
---|---|
Non-compliance reasons related to discharge limits in Table 1 | Monthly average concentration |
Related to other discharge information in Table 1 | No |
Related to Table 2 | Yes |
Non-compliance reasons related to Table 2 | Sampling and analysis method |
Non-compliance ever ongoing | No |
Formal investigation
Formal investigation ever opened | No |
---|