Back

IRS/2024/5372/OPPC

Notification details

Status Completed
First observed date 19 November 2024
First observed time 08:40
Organisation involved PERENCO UK LIMITED
Installation Leman BD Platform [PERENCO]
Field LEMAN [PERENCO][pt. of LEMAN]
Latitude 53° 3' 7.476'' N
Longitude 2° 17' 10.818'' E
Quadrant / block no. 49 / 27

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4 Discharge Conditions 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table. 4.2 e) having been sampled at the sampling location(s) as specified in that Table.

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Monthly average concentration
Related to other discharge information in Table 1 No
Related to Table 2 Yes
Non-compliance reasons related to Table 2 Sampling and analysis method
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No