Back

IRS/2025/5829/OPPC

Notification details

Status Completed
First observed date 19 February 2025
First observed time 23:00
Organisation involved CNR INTERNATIONAL (U.K.) LIMITED
Installation Ninian Central Platform
Field NINIAN
Latitude 60° 51' 24.42'' N
Longitude 1° 28' 8.73'' E
Quadrant / block no. 3 / 3

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions 4.1
Total oil discharged 0.22 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum load
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Weather conditions

Wind direction 170°
Wind speed 50 knots
Significant wave height 6.4 metres

Formal investigation

Formal investigation ever opened No