IRS/2025/6250/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 28 May 2025 |
| First observed time | 08:00 |
| Organisation involved | PERENCO UK LIMITED |
| Installation | Inde AC Platform (PERENCO) |
| Field | INDEFATIGABLE [PERENCO] |
| Latitude | 53° 19' 25.12'' N |
| Longitude | 2° 34' 29.68'' E |
| Quadrant / block no. | 49 / 23 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | 4. Discharge Conditions - 4.1 No discharge(s) specified in Table 1 shall exceed the limit(s) for the parameters specified in that Table. |
| Total oil discharged | 0.8524 tonnes |
Non-compliance details
| Related to discharge limits in Table 1 | Yes |
|---|---|
| Non-compliance reasons related to discharge limits in Table 1 | Monthly average concentration |
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | No |
| Non-compliance ever ongoing | Yes |
Weather conditions
| Wind direction | 295° |
|---|---|
| Wind speed | 11 knots |
| Significant wave height | 0.5 metres |
Formal investigation
| Formal investigation ever opened | No |
|---|