Back

IRS/2025/6703/OPPC

Notification details

Status Completed
First observed date 05 July 2023
First observed time 19:15
Organisation involved DANA PETROLEUM (E&P) LIMITED
Installation Triton FPSO
Field GUILLEMOT WEST
Latitude 57° 5' 2.1'' N
Longitude 0° 53' 32.8'' E
Quadrant / block no. 21 / 30

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Maximum Load (t/12hour) of oil in produced water discharged from slops exceeded 1 tonne
Total oil discharged 0.055 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum load
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Weather conditions

Wind direction 225°
Wind speed 15 knots
Significant wave height 1.0 metres

Formal investigation

Formal investigation ever opened No