IRS/2026/7154/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 04 December 2025 |
| First observed time | 15:30 |
| Organisation involved | SPIRIT ENERGY PRODUCTION UK LIMITED |
| Installation | Morecambe South CPP1 Platform |
| Field | SOUTH MORECAMBE |
| Latitude | 53° 50' 44.31'' N |
| Longitude | 3° 35' 0.38'' W |
| Quadrant / block no. | 110 / 3 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | We have been unable to sample H2 Bi-annual produced water. The current tank level is at its normal operating range low level. Its contents will have been sat stagnant for 4 months, and we are unlikely to increase the volume much after restart to discharge a representative sample. Now year end has rolled over, this is confirmed as no further volume produced. |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | Yes |
| Non-compliance reasons related to Table 2 | Sampling frequency |
| Non-compliance ever ongoing | No |
Formal investigation
| Formal investigation ever opened | No |
|---|