Back

IRS/2026/7154/OPPC

Notification details

Status Completed
First observed date 04 December 2025
First observed time 15:30
Organisation involved SPIRIT ENERGY PRODUCTION UK LIMITED
Installation Morecambe South CPP1 Platform
Field SOUTH MORECAMBE
Latitude 53° 50' 44.31'' N
Longitude 3° 35' 0.38'' W
Quadrant / block no. 110 / 3

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions We have been unable to sample H2 Bi-annual produced water. The current tank level is at its normal operating range low level. Its contents will have been sat stagnant for 4 months, and we are unlikely to increase the volume much after restart to discharge a representative sample. Now year end has rolled over, this is confirmed as no further volume produced.

Non-compliance details

Related to discharge limits in Table 1 No
Related to other discharge information in Table 1 No
Related to Table 2 Yes
Non-compliance reasons related to Table 2 Sampling frequency
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No