IRS/2026/7527/OPPC
Notification details
| Status | Completed |
|---|---|
| First observed date | 05 April 2026 |
| First observed time | 16:00 |
| Organisation involved | TAQA BRATANI LIMITED |
| Installation | Harding Platform |
| Field | HARDING |
| Latitude | 59° 16' 46.24'' N |
| Longitude | 1° 30' 58.04'' E |
| Quadrant / block no. | 9 / 23 |
Breached conditions details
| Related to a breach of an approved permit | Yes |
|---|---|
| Breached conditions | A sample shall be collected from the Gravity Base Tank (GBT) (Displacement) (Table 1) as per the sampling frequency stated in Table 2 (Bi-monthly). |
Non-compliance details
| Related to discharge limits in Table 1 | No |
|---|---|
| Related to other discharge information in Table 1 | No |
| Related to Table 2 | Yes |
| Non-compliance reasons related to Table 2 | Sampling frequency |
| Non-compliance ever ongoing | No |
Formal investigation
| Formal investigation ever opened | No |
|---|