Back

IRS/2026/7612/OPPC

Notification details

Status Completed
First observed date 28 April 2026
First observed time 02:58
Organisation involved ADURA OPERATIONS LIMITED
Installation Gannet A Platform
Field GANNET A
Latitude 57° 11' 3.752'' N
Longitude 0° 59' 54.329'' E
Quadrant / block no. 21 / 25

Breached conditions details

Related to a breach of an approved permit Yes
Breached conditions Oil in produced water overboard sample exceeded the regulatory limit of 100 mg/1
Total oil discharged 0.0083 tonnes

Non-compliance details

Related to discharge limits in Table 1 Yes
Non-compliance reasons related to discharge limits in Table 1 Maximum concentration
Related to other discharge information in Table 1 No
Related to Table 2 No
Non-compliance ever ongoing No

Formal investigation

Formal investigation ever opened No