Back

PON1/729

Notification details

Status Completed
First observed date 08 November 2011
First observed time 08:15
Incident type(s) Oil release
Organisations involved
Installation Pierce FPSO (Haewene Brim)
Installation type Fixed
Field PIERCE
Latitude 57° 9' 41.0'' N
Longitude 2° 17' 32.0'' E
Quadrant / block no. 23 / 27

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined
Total quantity of oil released 0.000002 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Thruster pitch control hydraulic system leak