Back

PON1/905

Notification details

Status Completed
First observed date 04 March 2012
First observed time 12:45
Incident type(s) Oil release
Organisations involved Marathon Oil UK Limited
Installation Brae A Platform
Installation type Fixed
Field Brae Field
Latitude 58° 41' 33.0'' N
Longitude 1° 16' 54.0'' E
Quadrant / block no. 7 / 16

Oil release details

Oil product released Lube Oil
How was the quantity released determined
Total quantity of oil released .873 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Heat exchanger tube rupture due to metallurgy failure/erosion.