Back

PON1/1259

Notification details

Status Completed
First observed date 18 August 2012
First observed time 11:15
Incident type(s) Oil release
Organisations involved Talisman Energy (UK) Limited
Installation Arbroath Platform
Installation type Fixed
Field ARBROATH
Latitude 57° 22' 29.084'' N
Longitude 1° 22' 59.036'' E
Quadrant / block no. 22 / 17

Oil release details

Oil product released Crude
How was the quantity released determined
Total quantity of oil released .00431 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Fluids in the closed drains vessel free-flowed back up the drains pipe work and through NRV and subsequently released to sea via generator fuel gas vent.