PON1/1324
Notification details
| Status | Completed |
|---|---|
| First observed date | 13 September 2012 |
| First observed time | 08:55 |
| Incident type(s) | Oil release |
| Organisations involved | |
| Installation | Maersk Resilient |
| Installation type | Mobile |
| Field | Joanne M 11 |
| Latitude | 56° 41' 48.06'' N |
| Longitude | 2° 14' 52.027'' E |
| Quadrant / block no. | 30 / 7 |
Oil release details
| Oil product released | Hydraulic Oil |
|---|---|
| How was the quantity released determined | |
| Total quantity of oil released | 0.002 tonnes |
Formal investigation
| Formal investigation ever opened | Yes |
|---|
Close off details
| Release ever ongoing | No |
|---|
Source details
| Source | Link tilt cylinder on DDM (top drive) had cracked leading to a release of hydraulic fluid to sea. |
|---|