Back

PON1/10205

Notification details

Status Completed
First observed date 01 April 2021
First observed time 02:00
Incident type(s) Oil release
Organisations involved
Installation Bruce D Platform
Installation type Fixed
Field BRUCE
Latitude 59° 44' 32.479'' N
Longitude 1° 40' 16.677'' E
Quadrant / block no. 9 / 8

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined
Total quantity of oil released 0.018 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Hydraulic Control System - Valve Failure - Operational Failure